Troja Data Center

Fig.1

  • Building repurposed and refurbished from old garages in 2024
  • Fully equipped with technologies in 2026
  • Trial operation from April 2026

Space

  • 20 racks (+2 for networking)
  • Rack configuration: 42U, each 800mm wide, 1200 mm deep

Cooling systems

  • Air cooling: 10 racks
  • Liquid cooling (LQC): 10 racks

LQC technology: Direct-to-chip cooling implemented via rack-mounted CDU units connected to a central fresh-water supply. Reserved for high-density computing servers such as high-end GPU and CPU servers.

Power Supply

  • max. 400 kW into IT
  • max. 10 kW into air-cooled racks
  • max. 30 kW into liquid cooled racks